US Shipping
Matson Express
Meisen regular ship:
Shanghai direct flight to Long Beach Port
"11 days to port, UPS can pick up as early as 12 days, and it takes about 13 days for the card to be delivered to the warehouse."
Ultimate timeliness, compensation for exceeding the time limit, reliable and guaranteed
Meisen overtime ship:
Shanghai direct flight to Los Angeles
"11 days to port, UPS can pick up as soon as 13 days, and it takes about 14 days for the truck to deliver to the warehouse."
American general cargo ship
Container demolition in Los Angeles:
Adopting OA alliance: COSCO, EMC
The shipment will arrive at the port 14 days after departure, and UPS can provide pickup as early as 18 days. The truck delivery to the warehouse will take about 21 days
Auckland container unloading:
Adopting EMC, fast ship
The ship will arrive at the port 18 days after departure, and it will take about 27 days for the truck to deliver the goods to the warehouse
Chicago container unloading:
Employing EMC and COSCO fast ships
The ship will arrive at the port about 28 days after departure, with few stops, and the delivery to the warehouse via truck will take about 35 days
Houston container unloading:
Adopting EMC and COSCO fast ships
The ship will arrive at the port about 30 days after departure, with few stops, and the delivery to the warehouse via truck will take about 37 days
New York container dismantling:
Adopting EMC and COSCO fast ships
It takes about 32 days to arrive at the port after departure, with few stops, and it takes about 40 days for the truck to deliver the goods to the warehouse
Savannah container unloading:
Adopting EMC and COSCO fast ships
The ship will arrive at the port approximately 34 days after departure, with fewer stops, and the delivery to the warehouse via truck will take about 42 days
lang

